
Workover Rigs
SJ is the largest workover equipment manufacturing base in China,with a full range of self-propelled workover rigs with a maximum hook load of 600kN~2750kN. We have developed various fast moving,efficient, and energy-saving new products that meet different environmental and operational requirements. We have produced and sold more than 2000 truck-mounted workover rigs, including 834 units exported to over 30 countries and oil producing regions around the world. We are the largest manufacturer in terms of production,sales, and export volume in China.
Selection Notes for Workover Rigs
Workover Rigs should be reviewed against the actual operating duty and supporting equipment, not only the model name. Confirm rated depth or hook load, mast and substructure arrangement, mobility, power source and wellsite access before quotation.
Application Fit
When reviewing Workover Rigs, the relevant application discussions include mature fields, remote wells, deep workover and routine intervention. The final application fit depends on the project specification, operating envelope and local requirements. Request the current technical file for Workover Rigs and confirm rated depth, hook load, mast arrangement, mobility and maintenance access. The product image is a visual reference; final selection should follow the project configuration and operating envelope.
Inquiry Data for Workover Rigs
- Well depth, rated hook load and expected tubing or casing handling duty.
- Mast arrangement, drawworks, substructure and travelling equipment requirements.
- Trailer, truck or skid mobility, road conditions and setup time at the wellsite.
- Temperature, dust, desert, mountain, cold-weather or other environmental exposure.
- Pressure-control, hydraulic-power, generator and auxiliary equipment interfaces.
- Rig layout, load chart, inspection scope, spares and field-support expectations.
Engineering Review and Delivery Scope
Before the workover package is confirmed, the buyer and supplier should align the configuration, interfaces, inspection scope, documentation package, spare-parts requirements, commissioning responsibilities and after-sales communication route for Workover Rigs. A quotation should be evaluated against those details, not only against the headline product name.
For Workover Rigs, send the operating conditions and available tender documents through the inquiry form. When contacting SJ about Workover Rigs, include well depth, workover scope, road conditions and deployment format. This allows the engineering team to identify the available drawings, parameter sheets and inspection documents for the configuration under review.
Product Parameters
Source values for workover rigs are transcribed from the matching category document. Confirm the final duty, pressure and interface requirements during technical review.
| Model | Nominal hook load kN (lb) | Max. load kN (lb) | Engine power kW (hp) |
|---|---|---|---|
| -- | 600 (131508) | 700 (151740) | 242 (325) |
| SXJ350 (XJ900) | 600 (134880) | 900 (1202320) | 287 (385) |
| SXJ400 (XJ1020) | 800 (220304) | 1020 (229296) | 335 (450) |
| SXJ450 (XJ1100) | 800 (220304) | 1100 (252900) | 354 (475) |
| SXJ550 (XJ1350) | 1000 (264365) | 1350 (303480) | 403 (540) |
| SXJ650 (XJ1600) | 1200 (303480) | 1600 (330456) | 522 (700) |
| SXJ750 (XJ1800) | 1500 (337200) | 1800 (382160) | 403×2 (540×2) |
| SXJ1000 (XJ2250) | 1800 (404640) | 2250 (505800) | 470×2 (630×2) |
| SXJ2750 | 2250 (505800) | 2750 (618200) | 485×2 (650×2) |
Send us the well conditions, target duty, quantity and destination. Our engineer will review the configuration with you.
Related procurement topics
Workover Rigs oilfield equipment supplier custom oilfield equipment international oilfield projects oil and gas production equipment
