SHS32 Fully Electric Sand Blending Skid oilfield equipment
Fracturing Equipment

SHS32 Fully Electric Sand Blending Skid

Product-specific information matched from the corresponding category document.

Technical overview

SHS32 Fully Electric Sand Blending Skid

Integrated equipment for liquid supply and sand blending, achieving the integration of liquid supply pump and sand blending system, with a maximum flow rate of 32m2/min;

Driven by a 380V motor, the distribution cabinet and equipment are integrated into a skid, with a compact structure and small volume

Meet the needs of both sand and water pumping operations, with a max. sand transporting capacity of 7.5m2/min, the sand content can reach 30% at 20m2/min.

Selection Notes for SHS32 Blending Skid

SHS32 Blending Skid should be reviewed against the actual operating duty and supporting equipment, not only the model name. Confirm pressure, displacement, fluid compatibility, mixing or pumping duty, power source and transport format before quotation.

Application Fit

When reviewing SHS32 Fully Electric Sand Blending Skid, the relevant application discussions include shale gas, tight oil, multi-stage stimulation and continuous pumping. The final application fit depends on the project specification, operating envelope and local requirements. Request the current technical file for SHS32 Fully Electric Sand Blending Skid and confirm pressure, displacement, pump arrangement, sand handling, blending and power supply. The product image is a visual reference; final selection should follow the project configuration and operating envelope.

Inquiry Data for SHS32 Fully Electric Sand Blending Skid

  • Required treating pressure, displacement and expected pumping schedule.
  • Pump count, drive method, continuous full-load duty and maintenance arrangement.
  • Sand blending, proppant conveying, fluid mixing, manifold and control requirements.
  • Electric, diesel or hybrid power availability and site connection limits.
  • Shale gas, tight oil, multi-stage, desert or other stimulation conditions.
  • Pumping curves, control architecture, inspection records and export documents.

Engineering Review and Delivery Scope

Before the stimulation package is confirmed, the buyer and supplier should align the configuration, interfaces, inspection scope, documentation package, spare-parts requirements, commissioning responsibilities and after-sales communication route for SHS32 Fully Electric Sand Blending Skid. A quotation should be evaluated against those details, not only against the headline product name.

For SHS32 Fully Electric Sand Blending Skid, send the operating conditions and available tender documents through the inquiry form. When contacting SJ about SHS32 Fully Electric Sand Blending Skid, include target pressure, rate, fluid system, power source and sand-handling scope. This allows the engineering team to identify the available drawings, parameter sheets and inspection documents for the configuration under review.

Product Tags

Browse related equipment and procurement topics:

Need a custom specification?
Send us the well conditions, target duty, quantity and destination. Our engineer will review the configuration with you.

Related procurement topics

Fracturing Equipment oilfield equipment supplier custom oilfield equipment international oilfield projects oil and gas production equipment

Back to all product families →