
Fracturing Wellhead Quick Plug in Device
Fracturing Wellhead Quick Plug in Device
The large diameter fracturing wellhead quick plug-in device independently developed by SJ can achieve single channel quick connection of multiple shale oil (gas) fracturing wellheads, and is the first quick-inserting device in China to adopt the form of large diameter swivel joints. The development and application of this device can further reduce the number of fracturing manifolds and operation costs, leading to full electrified and automated fracturing engineering services.
We have developed large-size quick connection fracturing manifold system, with single channel connection from manifold skid to wellhead,reducing quantity of wellhead manifold and labor intensity, and realizing quick switch connection of wellhead pumping lines.
No need of diversion manifolds and multiple piping, reducingoperation cost and promoting efficiency.
Quick connection fracturing manifold system: 5-1/8"-15K (bore:130mm), meeting the connection for three wells with 5m well space.
Selection Notes for Fracturing Wellhead Quick Plu
Fracturing Wellhead Quick Plu should be reviewed against the actual operating duty and supporting equipment, not only the model name. Confirm pressure, displacement, fluid compatibility, mixing or pumping duty, power source and transport format before quotation.
Application Fit
When reviewing Fracturing Wellhead Quick Plug in Device, the relevant application discussions include fracturing, well testing, drilling-fluid routing and high-pressure wellhead service. The final application fit depends on the project specification, operating envelope and local requirements. Request the current technical file for Fracturing Wellhead Quick Plug in Device and confirm pressure, displacement, pump arrangement, sand handling, blending and power supply. The product image is a visual reference; final selection should follow the project configuration and operating envelope.
Inquiry Data for Fracturing Wellhead Quick Plug in Device
- Working pressure, bore size and required fluid-control rating.
- Manifold layout, valve arrangement, outlet count and remote-operation needs.
- Material compatibility, fluid type, temperature and corrosion exposure.
- Wellhead, fracturing, drilling-fluid or testing-system connection details.
- Required instrumentation, test pressure, inspection agency and documentation.
- General arrangement, pressure class, test records and spare-valve requirements.
Engineering Review and Delivery Scope
Before the stimulation package is confirmed, the buyer and supplier should align the configuration, interfaces, inspection scope, documentation package, spare-parts requirements, commissioning responsibilities and after-sales communication route for Fracturing Wellhead Quick Plug in Device. A quotation should be evaluated against those details, not only against the headline product name.
For Fracturing Wellhead Quick Plug in Device, send the operating conditions and available tender documents through the inquiry form. When contacting SJ about Fracturing Wellhead Quick Plug in Device, include target pressure, rate, fluid system, power source and sand-handling scope. This allows the engineering team to identify the available drawings, parameter sheets and inspection documents for the configuration under review.
Product Parameters
Source values for fracturing wellhead quick plug in device are transcribed from the matching category document. Confirm the final duty, pressure and interface requirements during technical review.
| Parameter | Value |
|---|---|
| Nomimal bore | 5 1/8" |
| Rated pressure | 15000psi |
| Material grades | AA |
| Temperature class | PU |
Send us the well conditions, target duty, quantity and destination. Our engineer will review the configuration with you.
Related procurement topics
High Pressure Fluid Control Products oilfield equipment supplier custom oilfield equipment international oilfield projects oil and gas production equipment
