
Hydraulic Workover Equipment
It is an innovative stand-alone full-hydraulic workover equipment based on our research experience of offshore workover rigs and stand-alone snubbing units in combination with offshore platform workover operation need.
Compared with the conventional workover rigs with the mechanical drive,high mast and complicated structure, it is fully hydraulically powered.Hydraulic cylinders and hydraulic motors will accomplish the lifting,snubbing and rotating of tubing, with the advantages such as heavy load, large torque, optimized centralized control of operation console and convenient operation.
This equipment is featured by simple structure, compact layout and light weight. It is fitted with hydraulic skidding base and integrated wellhead device, meeting the requirements for offshore cluster-well operation and integral movement. Its successful development has filled the void of high-end offshore hydraulic workover rig in China, with 8 national patents awarded.
Suitable for high-dense cluster wells, small well site and offshore platform.
Modular lightweight design, the single module is less than 8T.
Rapid movement between wells, and the cost of installation and transportation is 30% less.
Selection Notes for Hydraulic Workover Equipment
Hydraulic Workover Equipment should be reviewed against the actual operating duty and supporting equipment, not only the model name. Confirm rated depth or hook load, mast and substructure arrangement, mobility, power source and wellsite access before quotation.
Application Fit
When reviewing Hydraulic Workover Equipment, the relevant application discussions include pressure-controlled workover, well servicing and intervention under live-well conditions. The final application fit depends on the project specification, operating envelope and local requirements. Request the current technical file for Hydraulic Workover Equipment and confirm rated depth, hook load, mast arrangement, mobility and maintenance access. The product image is a visual reference; final selection should follow the project configuration and operating envelope.
Inquiry Data for Hydraulic Workover Equipment
- Required snubbing force, well depth and live-well intervention objective.
- Pipe or tubing sizes, travelling system, slips and wellhead interface.
- Hydraulic power, control method, remote operation and deployment arrangement.
- Skid, trailer or truck format and access limitations at the workover location.
- Pressure, temperature, H2S, offshore, lake or other operating exposure.
- Load data, pressure-control drawings, inspection records and service support.
Engineering Review and Delivery Scope
Before the workover package is confirmed, the buyer and supplier should align the configuration, interfaces, inspection scope, documentation package, spare-parts requirements, commissioning responsibilities and after-sales communication route for Hydraulic Workover Equipment. A quotation should be evaluated against those details, not only against the headline product name.
For Hydraulic Workover Equipment, send the operating conditions and available tender documents through the inquiry form. When contacting SJ about Hydraulic Workover Equipment, include well depth, workover scope, road conditions and deployment format. This allows the engineering team to identify the available drawings, parameter sheets and inspection documents for the configuration under review.
Product Parameters
Source values for hydraulic workover equipment are transcribed from the matching category document. Confirm the final duty, pressure and interface requirements during technical review.
| Parameter | Value |
|---|---|
| Model | XJY160-270 |
| Max. lifting load kN | 1600~2700 |
| Max. snubbing load kN | 800 ~ 1350 |
| Pipe size in | 2-3/8" ~ 9-5/8" |
| Rotating torque kN.m | ~30 |
| Stroke m | 3.05/3.5 |
| Cylinder (pc) | 4 |
Send us the well conditions, target duty, quantity and destination. Our engineer will review the configuration with you.
Related procurement topics
Snubbing Units oilfield equipment supplier custom oilfield equipment international oilfield projects oil and gas production equipment
