
full automatic Workover Rigs
SXJ900DB high-efficiency full-automatic workover operation equipment adopts a new type of vertical self-balancing mast and traveling system with guide rail, and is equipped with a new type of vertical pipe handling system. It upgrades the automatic control system in an all-round way to realize the tubing processing efficiency > 50 jts/hr in workover operation,the automatic operation of sucker rod, and the one-key operation of tubular processing.
Upright mast without guy line and self-balancing crown block are adopted, and the deflection of loaded crown block is reduced by 80% compared with conventional models.
The traveling block moves with the guide rail of the mast, with small shaking and high efficiency of tubular handover.
The main rig is equipped with 4nos. stepping wellhead centralized devices, which can realize the adjustment of 10 mm level at the wellhead.
Equipped with pipe delivery unit from horizontal to vertical, theefficiency is increased by 20% compared with the conventional.
Sucker rod processing automation, equipped with visual wellhead stage detection system, to improve the tubing handling automation.
Selection Notes for full automatic Workover Rigs
full automatic Workover Rigs should be reviewed against the actual operating duty and supporting equipment, not only the model name. Confirm rated depth or hook load, mast and substructure arrangement, mobility, power source and wellsite access before quotation.
Application Fit
When reviewing full automatic Workover Rigs, the relevant application discussions include mature fields, remote wells, deep workover and routine intervention. The final application fit depends on the project specification, operating envelope and local requirements. Request the current technical file for full automatic Workover Rigs and confirm rated depth, hook load, mast arrangement, mobility and maintenance access. The product image is a visual reference; final selection should follow the project configuration and operating envelope.
Inquiry Data for full automatic Workover Rigs
- Well depth, rated hook load and expected tubing or casing handling duty.
- Mast arrangement, drawworks, substructure and travelling equipment requirements.
- Trailer, truck or skid mobility, road conditions and setup time at the wellsite.
- Temperature, dust, desert, mountain, cold-weather or other environmental exposure.
- Pressure-control, hydraulic-power, generator and auxiliary equipment interfaces.
- Rig layout, load chart, inspection scope, spares and field-support expectations.
Engineering Review and Delivery Scope
Before the workover package is confirmed, the buyer and supplier should align the configuration, interfaces, inspection scope, documentation package, spare-parts requirements, commissioning responsibilities and after-sales communication route for full automatic Workover Rigs. A quotation should be evaluated against those details, not only against the headline product name.
For full automatic Workover Rigs, send the operating conditions and available tender documents through the inquiry form. When contacting SJ about full automatic Workover Rigs, include well depth, workover scope, road conditions and deployment format. This allows the engineering team to identify the available drawings, parameter sheets and inspection documents for the configuration under review.
Send us the well conditions, target duty, quantity and destination. Our engineer will review the configuration with you.
Related procurement topics
Workover Rigs oilfield equipment supplier custom oilfield equipment international oilfield projects oil and gas production equipment
