SXJ750 Workover rig oilfield equipment
Workover Rigs

SXJ750 Workover rig

Product-specific information matched from the corresponding category document.

Technical overview

SXJ750 Workover rig

In response to the requirements for rapid transition in the Middle East and North Africa, a compact workover rig package for small well site was developed.

High integration: only 2 modules: workover rig and drill floor.

Hydraulically-lifted trailerized drill floor: integrated transportation of driller's cabin, doghouse, blowout preventer, etc. with the drill floor.

Full trailerized drill floor and peripheral equipment: Efficient rig movement, no need for crane assistance.

Product Parameters

Parameter table from the corresponding category document. Confirm final values against the selected configuration and operating duty.

sxj750 workover rig parameter table

Selection Notes for SXJ750 Workover rig

SXJ750 Workover rig should be reviewed against the actual operating duty and supporting equipment, not only the model name. Confirm rated depth or hook load, mast and substructure arrangement, mobility, power source and wellsite access before quotation.

Application Fit

When reviewing SXJ750 Workover rig, the relevant application discussions include mature fields, remote wells, deep workover and routine intervention. The final application fit depends on the project specification, operating envelope and local requirements. Request the current technical file for SXJ750 Workover rig and confirm rated depth, hook load, mast arrangement, mobility and maintenance access. The product image is a visual reference; final selection should follow the project configuration and operating envelope.

Inquiry Data for SXJ750 Workover rig

  • Well depth, rated hook load and expected tubing or casing handling duty.
  • Mast arrangement, drawworks, substructure and travelling equipment requirements.
  • Trailer, truck or skid mobility, road conditions and setup time at the wellsite.
  • Temperature, dust, desert, mountain, cold-weather or other environmental exposure.
  • Pressure-control, hydraulic-power, generator and auxiliary equipment interfaces.
  • Rig layout, load chart, inspection scope, spares and field-support expectations.

Engineering Review and Delivery Scope

Before the workover package is confirmed, the buyer and supplier should align the configuration, interfaces, inspection scope, documentation package, spare-parts requirements, commissioning responsibilities and after-sales communication route for SXJ750 Workover rig. A quotation should be evaluated against those details, not only against the headline product name.

For SXJ750 Workover rig, send the operating conditions and available tender documents through the inquiry form. When contacting SJ about SXJ750 Workover rig, include well depth, workover scope, road conditions and deployment format. This allows the engineering team to identify the available drawings, parameter sheets and inspection documents for the configuration under review.

Product Tags

Browse related equipment and procurement topics:

Need a custom specification?
Send us the well conditions, target duty, quantity and destination. Our engineer will review the configuration with you.

Related procurement topics

Workover Rigs oilfield equipment supplier custom oilfield equipment international oilfield projects oil and gas production equipment

Back to all product families →