
Ten thousand meter ultra deep well workover rig
The world's first 10,000m deep well workover rigs, developed and built by SJPETRO, is truck-mounted workover rigs with maximum hook load worldwide so far,filling the technical gap of ultra-deep well workover rig, and will make sustainable contribution in the ultra-deep well servicing operation for many years in China.
These workover rigs have been put into operation at Sinopec "Shendi Well 1" in Xinjiang Shunbei Oil and Gas Field since September 2023.
Only four (4) loads are needed for main rig movement to significantly improve the efficiency of installation and commissioning within 6 hours. Currently, it has completed the deep-well complicated operations like Wells SHB5-5H and 5-4, with a maximum drilling depth of 8500m, totaling 35 trips of tripping in and out operations.
The workover rig packages are field proven, a testimony of durability, reliability and high efficiency you can account on.
Selection Notes for Ten thousand meter ultra
Ten thousand meter ultra should be reviewed against the actual operating duty and supporting equipment, not only the model name. Confirm rated depth or hook load, mast and substructure arrangement, mobility, power source and wellsite access before quotation.
Application Fit
When reviewing Ten thousand meter ultra deep well workover rig, the relevant application discussions include mature fields, remote wells, deep workover and routine intervention. The final application fit depends on the project specification, operating envelope and local requirements. Request the current technical file for Ten thousand meter ultra deep well workover rig and confirm rated depth, hook load, mast arrangement, mobility and maintenance access. The product image is a visual reference; final selection should follow the project configuration and operating envelope.
Inquiry Data for Ten thousand meter ultra deep well workover rig
- Well depth, rated hook load and expected tubing or casing handling duty.
- Mast arrangement, drawworks, substructure and travelling equipment requirements.
- Trailer, truck or skid mobility, road conditions and setup time at the wellsite.
- Temperature, dust, desert, mountain, cold-weather or other environmental exposure.
- Pressure-control, hydraulic-power, generator and auxiliary equipment interfaces.
- Rig layout, load chart, inspection scope, spares and field-support expectations.
Engineering Review and Delivery Scope
Before the workover package is confirmed, the buyer and supplier should align the configuration, interfaces, inspection scope, documentation package, spare-parts requirements, commissioning responsibilities and after-sales communication route for Ten thousand meter ultra deep well workover rig. A quotation should be evaluated against those details, not only against the headline product name.
For Ten thousand meter ultra deep well workover rig, send the operating conditions and available tender documents through the inquiry form. When contacting SJ about Ten thousand meter ultra deep well workover rig, include well depth, workover scope, road conditions and deployment format. This allows the engineering team to identify the available drawings, parameter sheets and inspection documents for the configuration under review.
Send us the well conditions, target duty, quantity and destination. Our engineer will review the configuration with you.
Related procurement topics
Workover Rigs oilfield equipment supplier custom oilfield equipment international oilfield projects oil and gas production equipment
